Painting & decorating

New build painting

Decoration of new plaster and joinery needs coordination with the trades that precede it, and a clear distinction between first decoration and snagging.

Discuss your project

Preparation before the finish

Check that surfaces are ready for the selected paint system before starting. Outstanding wet trades, joinery installation and service alterations can interrupt a finish. Record the scope of local repairs rather than assuming decoration covers every defect.

Choosing the specification

Agree the lighting and conditions for reviewing the work. Local touch-ups may show against an existing finish, so some surfaces may need a complete coat. Keep the paint references and room schedule with the handover information.

Define the work in your quotation

The quotation should identify the surfaces, preparation, products, access and exclusions. Share photographs and the property address so that we can discuss the condition and arrange the next step.

  • Surface readiness
  • Other trades and sequence
  • Snagging items included
  • Review and touch-up scope

Start with a conversation

Tell us about your property.

Share the address, the rooms or surfaces, and what you have in mind.